SlideShow

  • Soil Cement Batch Plant looking east.
  • Soil Cement Batch Plant looking east.
  • Re-Bar cage for to be installed in drill shaft- 75 ft long, approximately 7 ft diameter.
  • Drill rig drilling a pier shaft.
  • Stormwater inundates West abutment soil cement excavation.

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to Palo Parado Bridge Project, July 2012 photos